Find the existing drain first
Before planning a new run, it helps to know exactly where the existing drains go, how deep they are and what condition they are in. Our drain tracing and mapping work does this with a camera and locating sonde. Connecting new pipe into an old drain that is cracked or root-damaged simply moves the problem.
Approvals
New below-ground drainage is building work, so in most cases it needs building control approval and is inspected as it goes in. If the work is near or over a shared or public sewer, the water company may need to agree it; our build over agreement guide explains that in general terms. A new connection to the public sewer normally needs the water company's consent before work starts.
Fall, size and materials
Underground drains rely on a steady fall so waste moves without settling. Too shallow and solids collect; too steep in short sections and water runs ahead of solids. Pipe size depends on what it serves. Modern installations normally use plastic pipe with flexible joints bedded on and surrounded by suitable granular material, which allows for small ground movement.
Access for the future
A good installation includes inspection chambers or access points at changes of direction and junctions, so the run can be inspected and cleared later. Burying a new connection with no way in is a common shortcut that costs more the first time it blocks.
The work on site
The trench is excavated to the planned line and depth, the existing drain is opened at the connection point, and the new pipe is laid, joined and tested. After inspection, it is backfilled and the surface reinstated. Larger digs follow the approach described on our drain excavation and replacement page.
Common mistakes to avoid
Connecting rainwater into a foul drain, or foul waste into a surface water drain, is a frequent error and can breach water company rules. Joining a new pipe at a sharp angle without a chamber, laying pipe on uneven bedding or covering it before it has been inspected can all lead to problems that only show up later. Getting the levels checked before the trench is dug saves rework.
If the property is off mains drainage, the new run may need to discharge to a septic tank or treatment plant instead; see septic tank installation.
Planning a new connection
Share any plans or drawings, the location of existing chambers and what the new drain will serve. Availability and scope are confirmed when you call or after a CCTV inspection, so you know exactly what will be done before any work is agreed. Call 0333 335 7414 or send an enquiry.
Frequently asked questions
Do I need building control approval for a new drain?
In most cases, yes. New below-ground drainage is usually notifiable building work and is inspected before it is covered over.
Can a new drain connect to the public sewer?
It can, but a new connection to a public sewer normally needs the water company's consent first. They set out their requirements when you apply.
How deep does a new drain need to be?
It depends on the levels of the existing drain, the fittings being served and what goes over the pipe. Enough cover protects it from damage and frost.
Can my extension's drainage join the existing drain?
Usually, if the existing drain is in good condition and has capacity. A camera check first shows whether the connection point is sound.